Atlanta, GA - The Kopf Consulting Group, on behalf of the Design Team, was awarded the structural design contract for the newest expansion of the Toyotetsu Facility located in Somerset, Kentucky. The facility will include 36,800 square feet of building footprint and a 20 Metric Ton crane bay spanning 74’-6”. The height of wall from footing to top of panel is approximately 38 feet.
The Design Team consists of the Bristol Group and The Kopf Consulting Group.
For more information, contact:
Philip Kopf, P.E., President
The Kopf Consulting Group, Inc.
3382 Saxony Glen – Suite 100
Marietta, Georgia 30066-4796
(770) 977-4534 Voice
(678) 731-1599 Fax
http://www.economybydesign.com
